Results-Driven EV Charging Engineering
Full engineering plan sets for 100+ commercial EV charging sites — from a single Level 2 install to multi-bay Level 3 fast-charging hubs, built for first-pass permit approval.
Overview
Every design is built for first-pass permit approval, with foundation and structural design coordinated through trusted subcontractor partners. We work directly with fleet operators, developers, and site hosts to turn a parking lot into a charging destination.
What's Included
- ✓Detailed electrical engineering for Level 1, 2 & 3 systems
- ✓Permit & construction (IFP/IFC) plan sets
- ✓Station layout & electrical configuration
- ✓Structural design for equipment foundations (via subcontractor)
- ✓Fleet & depot electrification planning
- ✓Power distribution & load coordination
- ✓Utility make-ready coordination
- ✓Signage & ADA-compliant stall layout
Related Work
EV Charging Projects
EV Charging · [Ports]
Fleet Electrification Hub
Level 3 DC fast-charging layout and permit set for a commercial fleet depot.
EV Charging · [Ports]
Multi-Bay Level 3 Charging Plaza
High-power DC fast-charging plaza design for a commercial travel-center site.
Ready to scope your charging site?
Tell us the port count, site type, and timeline — our team will respond within one business day.
